MODULAR OFFICES FOR EL CORTE INGLÉS
In the past month of august we installed an assembly of modules for offices and surveillance for El Corte Inglés.
Windows CLIMALIT
Coorporative green structure
Carpentry with thermal break
In the past month of august we installed an assembly of modules for offices and surveillance for El Corte Inglés.
Windows CLIMALIT
Coorporative green structure
Carpentry with thermal break
During the month of august 2013 we have fabricated and installed a prefabricated storage hall which is isolated with metalic sandwich panels for the factory of DECASA in Madrid.
In only one month we fabricated the hall and did all the work that occures besides the fabrication